The Multi-Cloud CIS Benchmarks Power BI template turns Prowler compliance CSV exports into an interactive dashboard. The template ingests scan results from Prowler CLI or Prowler Cloud and renders cross-provider CIS Benchmark coverage, profile-level breakdowns, regional drill-downs, and time-series trends. Center for Internet Security (CIS) Benchmarks are industry-standard configuration baselines maintained by CIS. The template and its source files live in the Prowler repository under contrib/PowerBI/Multicloud CIS Benchmarks. Multi-Cloud CIS Benchmarks Power BI report cover showing aggregated compliance posture across providers

Prerequisites

The setup requires the following components:
  • Microsoft Power BI Desktop: free download from Microsoft.
  • Prowler compliance CSV exports: produced by Prowler CLI or downloaded from Prowler Cloud or Prowler App.
  • Local directory: holds the CSV exports that the template ingests at load time.

Supported CIS Benchmarks

The template ships with predefined mappings for the following CIS Benchmark versions. Exports must match these versions for the dashboard to populate correctly:
Compliance FrameworkVersion
CIS Amazon Web Services Foundations Benchmarkv6.0
CIS Microsoft Azure Foundations Benchmarkv5.0
CIS Google Cloud Platform Foundation Benchmarkv4.0
CIS Kubernetes Benchmarkv1.12.0
Other CIS Benchmark versions are not recognized by the template. Confirm the framework version before running the scan or downloading the export.

Setup

Step 1: Install Microsoft Power BI Desktop

Download and install Microsoft Power BI Desktop from the official Microsoft site. The template is opened with this application.

Step 2: Generate Compliance CSV Exports

Compliance CSV exports can be generated through Prowler CLI or downloaded from Prowler Cloud and Prowler App.

Option A: Prowler CLI

Run a scan with the --compliance flag pointing to the appropriate CIS framework, for example:
prowler aws --compliance cis_6.0_aws
prowler azure --compliance cis_5.0_azure
prowler gcp --compliance cis_4.0_gcp
prowler kubernetes --compliance cis_1.12_kubernetes
The compliance CSV exports are written to output/compliance/ by default.

Option B: Prowler Cloud or Prowler App

Open the Compliance section, select the desired CIS Benchmark, and download the CSV export. Compliance section in Prowler Cloud showing the CSV download option for a CIS Benchmark scan

Step 3: Create a Local Directory for the Exports

Place every CSV export in a single local directory. The template parses filenames to detect the provider, so filenames must keep the provider keyword (aws, azure, gcp, or kubernetes).
Time-series visualizations such as “Compliance Percent Over Time” require multiple scans from different dates in the same directory.

Step 4: Open the Power BI Template

Download the template file Prowler Multicloud CIS Benchmarks.pbit and open it. Power BI Desktop prompts for the full filepath to the directory created in step 3.

Step 5: Provide the Directory Filepath

Enter the absolute filepath without quotation marks. The Windows “copy as path” feature wraps the path in quotation marks automatically; remove them before submitting.

Step 6: Save the Report as a .pbix File

Once the filepath is submitted, the template ingests the CSV exports and renders the report. Save the populated report as a .pbix file for future use. Re-running the .pbit template generates a fresh report against an updated directory.

Validation

To confirm the CSV exports were ingested correctly, open the “Configuration” tab inside the report. Configuration tab in the Power BI report displaying loaded CIS Benchmarks, the Prowler CSV folder path, and the list of ingested exports The “Configuration” tab exposes three tables:
  • Loaded CIS Benchmarks: lists the benchmarks and versions supported by the template. This table is defined by the template itself and is not editable. All benchmarks remain listed regardless of which provider exports were supplied.
  • Prowler CSV Folder: displays the absolute path provided during template load.
  • Loaded Prowler Exports: lists every CSV file detected in the directory. A green checkmark identifies the file used as the latest assessment for each provider and benchmark combination.

Report Sections

The report is organized into three navigable pages:
Report PagePurpose
OverviewAggregates CIS Benchmark posture across AWS, Azure, Google Cloud, and Kubernetes.
BenchmarkFocuses on a single CIS Benchmark with profile-level and regional filters.
RequirementDrill-through page that surfaces details for a single benchmark requirement.

Overview Page

The Overview page summarizes CIS Benchmark posture across every supported provider. Overview page in the Power BI report aggregating CIS Benchmark posture across AWS, Azure, Google Cloud, and Kubernetes The Overview page contains the following components:
ComponentDescription
CIS Benchmark OverviewTable listing benchmark name, version, and overall compliance percentage.
Provider by Requirement StatusBar chart breaking down requirements by status and provider.
Compliance Percent HeatmapHeatmap of compliance percentage by benchmark and profile level.
Profile Level by Requirement StatusBar chart breaking down requirements by status and profile level.
Compliance Percent Over Time by ProviderLine chart tracking overall compliance percentage over time by provider.

Benchmark Page

The Benchmark page focuses on a single CIS Benchmark. The benchmark, profile level, and region can be selected through dropdown filters. Benchmark page in the Power BI report showing region heatmap, section breakdown, time-series trend, and the requirements table The Benchmark page contains the following components:
ComponentDescription
Compliance Percent HeatmapHeatmap of compliance percentage by region and profile level.
Benchmark Section by Requirement StatusBar chart of requirements grouped by benchmark section and status.
Compliance Percent Over Time by RegionLine chart tracking compliance percentage over time by region.
Benchmark RequirementsTable listing requirement section, requirement number, requirement title, number of resources tested, status, and failing checks.

Requirement Page

The Requirement page is a drill-through view that exposes the full context of a single requirement. To populate the page, right-click a row in the “Benchmark Requirements” table on the Benchmark page and select “Drill through” > “Requirement”. Requirement drill-through page in the Power BI report showing rationale, remediation, regional breakdown, and the resource-level check results The Requirement page contains the following components:
ComponentDescription
TitleRequirement title.
RationaleRationale for the requirement.
RemediationRemediation guidance for the requirement.
Region by Check StatusBar chart of Prowler check results grouped by region and status.
Resource Checks for Benchmark RequirementsTable listing resource ID, resource name, status, description, and the underlying Prowler check.

Walkthrough Video

A full walkthrough is available on YouTube: Multi-Cloud CIS Benchmarks Power BI walkthrough video thumbnail

Compliance Frameworks

Review the Compliance workflow across Prowler Cloud, Prowler App, and Prowler CLI.

Prowler Dashboard

Explore the built-in local dashboard for Prowler CSV exports.